AUV Harbour Approach Survey in the Caspian Sea14/01/2008 |
| In 2007 the Gavia Autonomous Underwater Vehicle and the GeoSwath wide swath bathymetric sonar were used for the first time to perform a post-dredge survey of a port approach. This was part of an investigation of grounding of an oil company's supply vessels. The survey found sandbars in the harbour approach which had been missed by previous single-beam surveys. |
|
The Gavia AUV was launched from a vessel holding station outside the port area. For the first mission it was programmed to run several metres below the surface and fully map the harbour approach channel using six 500m survey lines at 40m line spacing. This took less than an hour, and the Gavia then returned to the mother vessel and surfaced. The Gavia's short-range wireless communications link was used to download the survey data from the GeoSwath unit. After a check of the data quality a second mission was uploaded, this time to survey the harbour approach inside the breakwater.
Read more about: vessel Construction AUV Website: http://www.gavia.is Supplier: GeoAcoustics Ltd More news from this supplier: GeoSwath Provides Training Course and Seminar AUVs Map Coral Reef Environment Sedimentation Monitored in Yellow River Dam Submerged Aquatic Vegetation Mapping GeoSwath Plus for Ifremer and Rijkswaterstaat Hypack - GeoSwath Interface Man Overboard Alarm Kolkata Port Navigates the Future Global Digital Vector Chart Service AHS's First Agreement on Electronic NtMs Spotlight on Structural Integrity Management Geolab Positioning Contract Engineering Solutions to Complex Subsea Systems Hegg Marine Solutions Launches New Business Vince Dobbin General Manager WFS Secrets of Malta's Historic Water Systems Comments (0): |
The Gavia was in the Caspian Sea to perform a pre-lay trench survey for the engineering and
The GeoSwath data was processed within an hour of the Gavia's return. The bathymetric map revealed several sandbars extending into the shipping channel, still showing the keel marks from the reported groundings. This map was supplied to the port authorities who carried out the required remedial dredge works.
