EMGS Achieves 70 Trillion Calculations per Second03/04/2008 |
| Electromagnetic Geoservices ASA (EMGS) has increased its electromagnetic data processing and modelling capabilities by more than trebling the number of Dell blade servers in its computing cluster. The additional computing power strengthens EMGS's position on the EM-imaging market, and will enable it to meet the future needs of its customers, which are increasing in number and demanding more advanced EM imaging products. |
|
According to Terje Eidesmo, EMGS president and CEO, the major benefit is that the capacity for simultaneously handling large datasets has dramatically increased. This improves turnaround times and enables more sophisticated imaging and modelling algorithms to be used, which improves modelling and processing accuracy. The extra capacity means that research and development work for the future benefit of customers can be run simultaneously with the advanced processing work they need to make today's exploration and production decisions.
Supplier: EMGS AS More news from this supplier: EMGS - Fugro Multi-Client Project EMGS Awarded 3D EM Survey Second Purpose-built 3D EM Vessel EMGS Reorganises Marine EM Strategic Alliance Shell Awards 3D EM Survey EMGS Signs Gobal Frame Agreement Patent Dispute Decision and Strategic Review First Purpose-Built EM Survey Vessel Barents Sea Multi-client EM Survey Storm Surge Website Underwater Acoustic Modems With Embedded Developer Platform Baseline Measurements of Carbon in Arctic Ocean CARIS LOTS Support for Windows 7 Vegetation-classifying Echosounder SeaZone Accepted as IHO Producer Agency Rear Admiral Ian Moncrieff to speak at CARIS 2012 BlueView Updates and Viewer Two More Boomers for Titan REMUS 100 for Norwegian University of Technology and Science Comments (0): |
| News |
| News > EMGS Achieves 70 Trillion Calculations per Second |
|
Interactive |
C&C Technologies' Sea Scout |
Video showing the 134' aluminium catamaran survey vessel and work boat featuring quad propeller propulsion. Sea Scout performs a variety of tasks for the offshore survey, research, geophysical and wind farm industries. See operational aspects and the building process of the vessel. Click here to read the article describing the vessel.
|
| Last 5 items: |
| C&C Technologies' Sea Scout |
| NOAA Launch Recovery |
| Hydrographic Sampling During CLIVAR S4P Cruise |
| Hydrographic Survey of Riverbed Erosion |
| Introduction to GEBCO |

The original cluster was already the largest in the EM sector. In March 2008, 1300 new blade servers (each with two dual-core CPUs) joined the 500 existing servers to create one of Europe's most powerful clusters. The cluster is theoretically capable of a staggering 70 trillion calculations per second (or 70 teraFLOPS), and has 22TB of memory, which is the equivalent of more than 20,000 standard PCs.