Spacer
News
News > C-Innovation Secures Heerema ROV Contract

C-Innovation Secures Heerema ROV Contract

  19/11/2008
C-Innovation, LLC has been awarded a multi-year ROV operational contract by Heerema Marine Contractors, for seven (7) ROV systems, starting in 2009. C-Innovation’s high specification Schilling Robotics UHD’s, combined with new situational awareness subsea visualisation, navigation and worldwide satellite communications, provide an operational convergence with Heerema Marine Contractors’ subsea operational goals for the future.

 

ROV operations will be coordinated by C-Innovation from the Gulf of Mexico, Brazil, North Sea and West Africa to support Heerema Marine Contractors’ worldwide operations.

 

 





Read more about:
 ROV 

Supplier: Edison Chouest Offshore

More news from this supplier:
ESA's SMOS and Proba-2 Satellites Launched
Diesel-electric OSVs


Offshore Survey Frame Agreement
ROV Survey of the Costa Concordia Grounding Site (video)
44 PMGS Transponders for Earthquake and Tsunami Research
Underwater Vision to Fugro Subsea Services
Award for Brazilian Hydrographic Paper
Demonstrating a 'Deeper Understanding'
First Real-Time Seafloor Earthquake Observatory
Theme of Hydrography Day 2012: International Cooperation
Finistère and Mediterranean Bathymetric Lidar Surveys
Precise Positioning For BP Vessels


     


Comments (0):
There are no comments yet.
Make your comment:
Name:
Your comment:
Type over the 2 words (or number) from the picture
 
Most Popular Articles Most Popular News Most Popular Jobs
Spacer
Spacer
 

Interactive


Hydrographic Survey of Riverbed Erosion

Members of the US Geological Survey were filmed while out on the Missouri River at Williston, North Dakota, USA, performing a hydrographic survey to monitor the state of riverbed erosion. They were using a multibeam echo sounder which transmits sound energy and analyses the return signal (echo) that has bounced off the riverbed or other objects. Multibeam sonars emit sound waves from directly beneath a ship's hull to produce fan-shaped coverage of the riverbed. 


Gauge height at the Williston gauge was approximately 27.65 feet when this video was taken. Additional information about the USGS streamgauge at Williston is available at http://waterdata.usgs.gov/nd/nwis?program=nwisman&site_no=06330000

 

 Last 5 items:
 Hydrographic Survey of Riverbed Erosion
 Introduction to GEBCO
 MCA on Surveying the British Coast
 Surveying in the Port of London
 Venessa O'Connell on Hydrography
 
Spacer
Spacer
Spacer
Spacer
Poll

What is More Interesting for Hydrographic Surveyors?


Spacer
Spacer
Spacer
Spacer
Spacer
Spacer