Pipelay Vessel DP2 Prepared09/04/2009 |
| Abu Dhabi-based National Petroleum Construction Company Ltd. (NPCC) has awarded Dutch design office Ulstein Sea of Solutions the Basic Design contract for their new large derrick pipelay vessel DLS-4200. The new vessel will be one of the biggest vessels of its kind, combining S-lay double joints pipelay operations with 4,200 sT lifting capacity and DP2 prepared. |
|
The design of the vessel is a modified version of the SOC 3000 design of Ulstein Sea of Solutions (USOS) and will be equipped with an Amclyde Model 80 crane. DLS-4200 is designed to operate worldwide, but will initially be equipped with a mooring system to operate in the Arabian Gulf and India. However, a future DP2 upgrade is envisaged and catered for in the design to minimise the technical impact in the future.
The vessel features two fixed pitch shaft driven main propellers of 5,500kW each which will allow for a sailing speed of 12-13 knots. For future DP upgrade five (5) retractable azimuth thrusters of 3,500kW each are required.
The Amclyde main crane is capable of lifting 4,200sT (3,800mT) at a 125ft radius over the stern in tie-back mode and 4,200sT at 95 ft without tie-back. In full revolving mode the crane is able to lift 2,950sT (2,680 T) with an outreach of 135ft.
Read more about: Construction India vessel Supplier: Ulstein Group More news from this supplier: Twentieth X-Bow Ready to Sail Polarcus to Build Arctic Seismic Vessels WG Cook Delivered Seismic Research Vessel Oceanic Vega Delivered Deepwater Repair Vessel Launch Polarcus Asima Named Sarah Delivered Ulstein Sea Of Solutions Wins Industrial Marketing Award 2008 Ulstein And Sea of Solutions Cluster Collaboration Offshore Survey Frame Agreement ROV Survey of the Costa Concordia Grounding Site (video) 44 PMGS Transponders for Earthquake and Tsunami Research Underwater Vision to Fugro Subsea Services Award for Brazilian Hydrographic Paper Demonstrating a 'Deeper Understanding' First Real-Time Seafloor Earthquake Observatory Theme of Hydrography Day 2012: International Cooperation Finistère and Mediterranean Bathymetric Lidar Surveys Precise Positioning For BP Vessels Comments (0): |
| News |
| News > Pipelay Vessel DP2 Prepared |
|
Interactive |
Hydrographic Survey of Riverbed Erosion |
Members of the US Geological Survey were filmed while out on the Missouri River at Williston, North Dakota, USA, performing a hydrographic survey to monitor the state of riverbed erosion. They were using a multibeam echo sounder which transmits sound energy and analyses the return signal (echo) that has bounced off the riverbed or other objects. Multibeam sonars emit sound waves from directly beneath a ship's hull to produce fan-shaped coverage of the riverbed.
|
| Last 5 items: |
| Hydrographic Survey of Riverbed Erosion |
| Introduction to GEBCO |
| MCA on Surveying the British Coast |
| Surveying in the Port of London |
| Venessa O'Connell on Hydrography |
