Spacer
News
News > Floating Wind Turbine Inauguration

Floating Wind Turbine Inauguration

  17/09/2009
Technip and StatoilHydro celebrated the inauguration of the Hywind demonstration wind turbine, which took place on 8th September in Karmøy, Norway. Located 10 kilometers offshore Karmøy, Hywind is the first full-scale floating wind turbine and has a capacity of 2.3MW.
 

Hywind principle

Following the award of the turnkey contract for the substructure of the wind turbine in May 2008, Technip's operating center in Oslo, Norway, performed the project management and installation engineering. Detail design and fabrication of the substructure was carried out at the Group's construction yard in Pori, Finland, which is specialized in the construction of Spar platforms.

 

After being towed in a horizontal position to the Åmøyfjoden fjord in Norway, the substructure was up-ended and stabilised before assembly with the wind mill, including the generator and the turbine blades. The completed floating wind mill, now in a vertical position, was then towed to the final location by three vessels and connected to the anchor system in June 2009. The total structure measures 165 metres of which 100 metres below the sea level.

 

The Hywind demonstration unit will operate for a period of at least two years. The objective is to gain knowledge on practical aspects of the operation and maintenance of floating offshore windmills.

 

 





Read more about:
 Offshore  Construction 

Supplier: Technip Offshore UK


Storm Surge Website
Underwater Acoustic Modems With Embedded Developer Platform
Baseline Measurements of Carbon in Arctic Ocean
CARIS LOTS Support for Windows 7
Vegetation-classifying Echosounder
SeaZone Accepted as IHO Producer Agency
Rear Admiral Ian Moncrieff to speak at CARIS 2012
BlueView Updates and Viewer
Two More Boomers for Titan
REMUS 100 for Norwegian University of Technology and Science


     


Comments (2):

How to see more and get more detailed info about the wind mill / wind turbine and the underwater construction as well as the anchor. bambang trisulo - 26/09/2009 - 03:05


I guess that the project’s conception and applications may allow participating institutes and researchers to nurture the technical skills and implementations that the project is focused on. Agata - 17/09/2009 - 17:06


Make your comment:
Name:
Your comment:
Type over the 2 words (or number) from the picture
 
Most Popular Articles Most Popular News Most Popular Jobs
Spacer
Spacer
 

Interactive


C&C Technologies' Sea Scout

 

Video showing the 134' aluminium catamaran survey vessel and work boat featuring quad propeller propulsion. Sea Scout performs a variety of tasks for the offshore survey, research, geophysical and wind farm industries. See operational aspects and the building process of the vessel. Click here to read the article describing the vessel.

 

 Last 5 items:
 C&C Technologies' Sea Scout
 NOAA Launch Recovery
 Hydrographic Sampling During CLIVAR S4P Cruise
 Hydrographic Survey of Riverbed Erosion
 Introduction to GEBCO
 
Spacer
Spacer
Spacer
Spacer
Poll

Are currently available solutions for obtaining and updating ENCs user-friendly?


Spacer
Spacer
Spacer
Spacer
Spacer
Spacer