EB's Largest Ever System to Sail26/05/2010 |
| Next week (w/b 31 May) will see a major milestone reached by IHC Engineering Business (EB), when their largest project to date, a 2,000t capacity J-Lay system for the Saipem FDS2 (Field Development Ship), leaves its manufacturing location on Teesside. The lay system will then be en route to the Samsung Heavy Industries' (SHI) Geoje shipyard in South Korea where EB's engineers will work closely with Saipem and SHI to install and commission the system on the new build vessel. |
|
"As one of only a handful of companies in the world active in the design and build of large capacity, complex J-Lay systems, we are immensely proud of this innovative system." says EB's Managing Director, Toby Bailey.
"We won the contract in the third quarter of 2007, and have worked closely with Saipem throughout every stage of development over the past two and a half years. This contract has certainly strengthened our reputation as a leading supplier of Pipelay Systems. To deliver it, we have made maximum use of our expanded resources together with the talents of the North of England supply chain.
"Proof of our engineering and production skills is the fact that DNV has issued design approval for this innovative J-Lay tower, and we have successfully met the stringent weight targets set by the client." The new system, one of the worlds largest and most versatile, is able to accommodate pipes from 4'' to 36'' and is rated at 2,000t hang-off capacity. By adjusting the angle of the tower (from 45 to 96 degrees) the system is capable of laying pipe in shallow or deep water. Key design drivers have been optimisation of pipe handling operations to ensure low cycle time, highly constrained working envelopes, and ensuring safety in all aspects of operation.
"There are plenty of fascinating statistics surrounding the J-Lay system including the fact that at 65 metres tall and 14 metres wide it is taller than the nearby Tyne Bridge," explains Toby Bailey. "The total weight of the tower including all pipe handling equipment is 2,500t and the maximum weight of pipe that can be hung off the tower is equivalent to suspending 266 double-decker buses; there are 25km of cable; 60,000 lines of software code; and over 5km of welding. Designing and building this first of a kind system has been a remarkable achievement that we are very proud of."
Read more about: Safety vessel software Supplier: IHC Engineering Business More news from this supplier: Launch and Recovery System for Canyon World’s Biggest Submarine Pipeline Plough Put to Work IHC EB to Showcase Engineering Solutions Lay System for Mcdermott International IHC EB Inter Array Trenching Spread EB's Largest Ever System Shipped EB New Facilities for Offshore IHC EB Technology at Offshore Wind 2009 EB's Presence at Offshore Europe Management Changes at IHC Engineering Business Offshore Survey Frame Agreement ROV Survey of the Costa Concordia Grounding Site (video) 44 PMGS Transponders for Earthquake and Tsunami Research Underwater Vision to Fugro Subsea Services Award for Brazilian Hydrographic Paper Demonstrating a 'Deeper Understanding' First Real-Time Seafloor Earthquake Observatory Theme of Hydrography Day 2012: International Cooperation Finistère and Mediterranean Bathymetric Lidar Surveys Precise Positioning For BP Vessels Comments (0): |
| News |
| News > EB's Largest Ever System to Sail |
|
Interactive |
Hydrographic Survey of Riverbed Erosion |
Members of the US Geological Survey were filmed while out on the Missouri River at Williston, North Dakota, USA, performing a hydrographic survey to monitor the state of riverbed erosion. They were using a multibeam echo sounder which transmits sound energy and analyses the return signal (echo) that has bounced off the riverbed or other objects. Multibeam sonars emit sound waves from directly beneath a ship's hull to produce fan-shaped coverage of the riverbed.
|
| Last 5 items: |
| Hydrographic Survey of Riverbed Erosion |
| Introduction to GEBCO |
| MCA on Surveying the British Coast |
| Surveying in the Port of London |
| Venessa O'Connell on Hydrography |
