Lay System for Mcdermott International29/11/2010 |
| A 300-tonne cable and pipe lay system will shortly be delivered to McDermott International Inc. The SURF (subsea umbilical riser and flowline) installation market is expanding and pushing into ever-deeper waters. At the same time IHC Engineering Business (IHC EB) has seen a dramatic expansion of its range of pipe and cable lay systems, with a number of large scale projects delivered, or ongoing. |
|
Read more about: Construction vessel Offshore Supplier: IHC Engineering Business More news from this supplier: Launch and Recovery System for Canyon World’s Biggest Submarine Pipeline Plough Put to Work IHC EB to Showcase Engineering Solutions IHC EB Inter Array Trenching Spread EB's Largest Ever System Shipped EB's Largest Ever System to Sail EB New Facilities for Offshore IHC EB Technology at Offshore Wind 2009 EB's Presence at Offshore Europe Management Changes at IHC Engineering Business Storm Surge Website Underwater Acoustic Modems With Embedded Developer Platform Baseline Measurements of Carbon in Arctic Ocean CARIS LOTS Support for Windows 7 Vegetation-classifying Echosounder SeaZone Accepted as IHO Producer Agency Rear Admiral Ian Moncrieff to speak at CARIS 2012 BlueView Updates and Viewer Two More Boomers for Titan REMUS 100 for Norwegian University of Technology and Science Comments (0): |
| News |
| News > Lay System for Mcdermott International |
|
Interactive |
C&C Technologies' Sea Scout |
Video showing the 134' aluminium catamaran survey vessel and work boat featuring quad propeller propulsion. Sea Scout performs a variety of tasks for the offshore survey, research, geophysical and wind farm industries. See operational aspects and the building process of the vessel. Click here to read the article describing the vessel.
|
| Last 5 items: |
| C&C Technologies' Sea Scout |
| NOAA Launch Recovery |
| Hydrographic Sampling During CLIVAR S4P Cruise |
| Hydrographic Survey of Riverbed Erosion |
| Introduction to GEBCO |
