Spacer
News
News > Polarcus to Build Arctic Seismic Vessels

Polarcus to Build Arctic Seismic Vessels

  20/12/2010
Polarcus is building two seismic vessels of the new generation type SX134 at the Ulstein Verft shipyard, to be delivered in 2012. ULSTEIN has designed and built a number of seismic vessels the past few years already. The two new generation ULSTEIN SX134s will receive their ICE-1A* class notation from DNV. This notation allows these vessels to operate in Arctic waters under harsh ice conditions without the assistance of icebreakers.

Impression of one of the arctic vessels

The entire vessel is ice-reinforced with thicker ribs and skin plates. The vessel has de-icing and ice-preventing systems at critical tanks and pipelines. Propellers, gears and thrusters are chosen and dimensioned based on specific rules for withstanding operation in ice. The two propellers are driven by two electric motors each; this ensures continuous operation and manoeuvring if parts of equipment are damaged. In addition, the ship has the DNV notation WINTERIZED BASIC. Escape corridors and rescue equipment are also protected against icing during Arctic operations. The vessel will have two workboats and an MOB on board.


The two vessels will be equipped for 3D seismic, and will get three additional lead-in winches on deck and two extra towing points adding up to fourteen towing points in all (fourteen streamers).The additional winches provide added flexibility to enable personnel to easily replace or repair components during operations, avoiding costs related to downtime. The SPS code provides added safety and enables operations worldwide. The vessel also carries the Clean Design Certificate.

 

Peter Zickerman, executive vice president Polarcus, noted that ULSTEIN's technical competence and innovative ship design was a good fit with Polarcus' business philosophy. "Together, we are developing the next-generation seismic vessels. We are witnessing an increasing demand amongst our clients for higher quality, more environmentally responsible, seismic services ," he says. "The X-BOW hull design combined with a number of green and future-oriented solutions helps us meet that demand with safer operations and better environmental performance."

 

Ulstein adds that according to feedback the company has received on the fifteen vessels in operation with the X-BOW design, the bow performs extremely well. "During seismic work, smooth acceleration is important to achieving more stable pulling power, which is crucial to exerting a more even load on seismic equipment," CEO Gunvor Ulstein says. "It also provides calmer and safer working conditions for the crew."


The vessels are scheduled for delivery in 2012, one in March and the other in June.

 

 





Read more about:
 vessel  Safety  Ice  Seismic 

Supplier: Ulstein Group

More news from this supplier:
Twentieth X-Bow Ready to Sail
WG Cook Delivered
Seismic Research Vessel Oceanic Vega Delivered
Deepwater Repair Vessel Launch
Polarcus Asima Named
Sarah Delivered
Pipelay Vessel DP2 Prepared
Ulstein Sea Of Solutions Wins Industrial Marketing Award 2008
Ulstein And Sea of Solutions Cluster Collaboration


Storm Surge Website
Underwater Acoustic Modems With Embedded Developer Platform
Baseline Measurements of Carbon in Arctic Ocean
CARIS LOTS Support for Windows 7
Vegetation-classifying Echosounder
SeaZone Accepted as IHO Producer Agency
Rear Admiral Ian Moncrieff to speak at CARIS 2012
BlueView Updates and Viewer
Two More Boomers for Titan
REMUS 100 for Norwegian University of Technology and Science


     


Comments (0):
There are no comments yet.
Make your comment:
Name:
Your comment:
Type over the 2 words (or number) from the picture
 
Most Popular Articles Most Popular News Most Popular Jobs
Spacer
Spacer
 

Interactive


C&C Technologies' Sea Scout

 

Video showing the 134' aluminium catamaran survey vessel and work boat featuring quad propeller propulsion. Sea Scout performs a variety of tasks for the offshore survey, research, geophysical and wind farm industries. See operational aspects and the building process of the vessel. Click here to read the article describing the vessel.

 

 Last 5 items:
 C&C Technologies' Sea Scout
 NOAA Launch Recovery
 Hydrographic Sampling During CLIVAR S4P Cruise
 Hydrographic Survey of Riverbed Erosion
 Introduction to GEBCO
 
Spacer
Spacer
Spacer
Spacer
Poll

Are currently available solutions for obtaining and updating ENCs user-friendly?


Spacer
Spacer
Spacer
Spacer
Spacer
Spacer