Spacer
News
News > Seabird Seismic Acquisition Deal

Seabird Seismic Acquisition Deal

  23/06/2011
Effective from midnight 20th May 2011, Spectrum has secured a significant 2D seismic acquisition capacity with Seabird for expansion of their Multi-Client library, together with a re-let agreement for Spectrum's vessel, the GGS Atlantic. As part of the continued growth of Spectrum's Multi-Client library, the company has now committed to the acquisition of 2D seismic data worth USD23 million over the next 3 years.



GGS AtlanticThis commitment is part of a signed frame agreement with SeaBird Exploration to draw on their extensive worldwide seismic fleet. Acquisition costs to Spectrum will be fixed at competitive market rates.


This agreement will ensure an efficient and sustainable working partnership perpetuated by Spectrum and Seabird since Spectrum's Big Wave in the Eastern Gulf of Mexico that utilised Seabird's vessel the R/v Munin to acquire infill data for this flagship product.


Under the agreement the bareboat charter of Spectrum's own seismic acquisition vessel, the GGS Atlantic will be assigned to Seabird until August 2012 on the same terms currently enjoyed by Spectrum.


The GGS Atlantic has been part of Spectrum since the Company flotation on the Oslo Stock Exchange in July 2008. During the intervening years the vessel has achieved sterling service by significantly expanding Spectrum's already impressive Multi-Client library and that of other companies within the same discipline. Working initially in the Gulf of Mexico she then moved operations east of Africa, west India, and Colombia via another visit to the Gulf of Mexico to add to Spectrum's Big Wave survey.
Following the acquisition of a fourth phase of the Big Wave program in May 2010, her capability was enhanced when she was refitted to achieve small footprint, hi-res, 3D work which, she performed ably into water as shallow as 16 metres with 2 knot currents in Trinidad. Finally in March 2011 she went back to the Gulf of Mexico to finish Big Wave Phase 5. Where, on the 12th June she was physically handed over to Seabird.


This agreement is appropriate for both companies in that it ensures Spectrum can concentrate on and maintain core company objectives, values and expertise in the Multi-Client field, whilst simultaneously giving Seabird a progressive financial incentive commensurate with their own central company competence.


The Spectrum library of Multi-Client data incorporates global projects identified by their experienced team of geoscientists. Existing products included the Eastern Gulf of Mexico, East Greenland, the Italian Adriatic Sea, the Eastern Mediterranean and North-West Australia.

 

 





Read more about:
 vessel  Seismic  India  data 

Supplier: Spectrum ASA (Houston Office)

More news from this supplier:
Adriatic Multi-Client Survey Done
3D Multi-Client Merge Project Offshore Australia
US East Coast Seismic Reprocessing Project
Transatlantic Corporate Network Update
2D Multi-Client surveys Offshore South America
Levantine Basin Seismic Analysis Validated
Boost for Big Wave Expansion
Australia's Largest MC 2D Seismic Library
3D Depth Imaging Technology Enhanced
Spectrum Sets Sights on East Coast US Geology


4D Surveying Above and Below Water
Sonar for Enhanced Mammal Detection
Storm Surge Website
Underwater Acoustic Modems With Embedded Developer Platform
Baseline Measurements of Carbon in Arctic Ocean
CARIS LOTS Support for Windows 7
Vegetation-classifying Echosounder
SeaZone Accepted as IHO Producer Agency
Rear Admiral Ian Moncrieff to speak at CARIS 2012
BlueView Updates and Viewer


     


Comments (0):
There are no comments yet.
Make your comment:
Name:
Your comment:
Type over the 2 words (or number) from the picture
 
Most Popular Articles Most Popular News Most Popular Jobs
Spacer
Spacer
 

Interactive


C&C Technologies' Sea Scout

 

Video showing the 134' aluminium catamaran survey vessel and work boat featuring quad propeller propulsion. Sea Scout performs a variety of tasks for the offshore survey, research, geophysical and wind farm industries. See operational aspects and the building process of the vessel. Click here to read the article describing the vessel.

 

 Last 5 items:
 C&C Technologies' Sea Scout
 NOAA Launch Recovery
 Hydrographic Sampling During CLIVAR S4P Cruise
 Hydrographic Survey of Riverbed Erosion
 Introduction to GEBCO
 
Spacer
Spacer
Spacer
Spacer
Poll

Are currently available solutions for obtaining and updating ENCs user-friendly?


Spacer
Spacer
Spacer
Spacer
Spacer
Spacer