New Kongsberg Maritime Subsea EVP13/01/2012 |
| Bjørn Jalving has been appointed as executive vice president of Kongsberg Maritime's Subsea division and a member of the Kongsberg Maritime management group, effective from 1st January 2012. Jalving succeeds Rolf Arne Klepaker, who is moving to a role working with strategic projects within Kongsberg Maritime. |
|
Klepaker started his career in Kongsberg Maritime in 1975 and up until 1990 was focused on roles within R&D. Since 1990, he has held various management positions within the Subsea division and has been one of the main driving forces in building it into a successful Kongsberg Maritime division.
Read more about: Defence AUV Supplier: Kongsberg Maritime More news from this supplier: Assessing Underwater Noise Impact of Offshore Renewables Kongsberg Completes Acquisition Evotec Over GBP1 Million Order from Fugro Star Center Manoeuvres into DP Training Market KBIMS: Rudder/Prop Tool for DP Ops Kongsberg FEMME Conference Special Kongsberg Demo Boat OE14-408 Underwater Digital Stills Camera Longest Multi-Sensor AUV Pipeline Inspection Ebird Seismic Streamer Control System Nominated 4D Surveying Above and Below Water Sonar for Enhanced Mammal Detection Storm Surge Website Underwater Acoustic Modems With Embedded Developer Platform Baseline Measurements of Carbon in Arctic Ocean CARIS LOTS Support for Windows 7 Vegetation-classifying Echosounder SeaZone Accepted as IHO Producer Agency Rear Admiral Ian Moncrieff to speak at CARIS 2012 BlueView Updates and Viewer Comments (0): |
| News |
| News > New Kongsberg Maritime Subsea EVP |
|
Interactive |
C&C Technologies' Sea Scout |
Video showing the 134' aluminium catamaran survey vessel and work boat featuring quad propeller propulsion. Sea Scout performs a variety of tasks for the offshore survey, research, geophysical and wind farm industries. See operational aspects and the building process of the vessel. Click here to read the article describing the vessel.
|
| Last 5 items: |
| C&C Technologies' Sea Scout |
| NOAA Launch Recovery |
| Hydrographic Sampling During CLIVAR S4P Cruise |
| Hydrographic Survey of Riverbed Erosion |
| Introduction to GEBCO |

Jalving started in Kongsberg Maritime in 2006 as senior principal engineer in the