Magnetic System Survey
News

Magnetic System Survey

Innovatum International Ltd has carried out a beach survey of the Bacton-to-Zeebrugge Gas Interconnector pipeline for Gardline Environmental Ltd. Despite being buried 5 metres deep the pipeline was successfully located and surveyed on the beach at Zeebrugge (Belgium). The survey was carried out using Innovatum Ultra equipment mounted on a survey ‘barrow’ and, carried out to the low water mark, took less than two hours to complete. Innovatum magnetising and tracking technology can be applied to virtually all submarine cables and pipelines.

Hydrography Newsletter

Value staying current with hydrography?

Stay on the map with our expertly curated newsletters.

We provide educational insights, industry updates, and inspiring stories from the world of hydrography to help you learn, grow, and navigate your field with confidence. Don't miss out - subscribe today and ensure you're always informed, educated, and inspired by the latest in hydrographic technology and research.

Choose your newsletter(s)