MMT Awarded Cable Route Survey for the Cobra Cable
Prysmian has awarded MMT to conduct the cable route survey for the Cobra cable. Ellen Svestad, CCO, comments upon the contract award that the COBRA cable is the planned subsea Interconnector between the Netherlands and Denmark. The survey contract includes inshore and offshore parts, consisting of geophysical, geotechnical and visual surveys including cable tracker for cable crossings.
MMT will conduct the surveys with their own ROTV, ROV & survey vessels Franklin, Seabeam and Ping. The work will commence in July 2016.
The cable is managed by two of MMT’s existing clients, namely TenneT and Energinet - the operators of the Dutch and the Danish power transmission grids.